Project overview

Sink Blockage & Grease Trap Installation

The school's kitchen sink was experiencing frequent blockages due to grease buildup. Our team:

  • Assessed the drainage system to identify the root cause
  • Installed a grease trap to prevent future clogs and improve wastewater management
  • Ensured proper flow and compliance with plumbing standards

Drinking Fountain Relocation

To improve accessibility and optimise space, we:

  • Disconnected and safely relocated the existing drinking fountain
  • Reconfigured plumbing lines to support the new location
  • Ensured proper drainage and functionality

Challenges & Solutions

  • Recurring Blockages: Addressed with a grease trap installation for long-term prevention
  • Limited Space for Fountain: Found an optimal new location without disrupting school operations
  • Minimizing Disruptions: Scheduled work outside school hours for a smooth transition

With these upgrades, Parktone Primary now benefits from a reliable kitchen drainage system and an improved water access point for students.